THE FACTORY OF
THE FUTURE.
MADE IN MALTA.

Southern Europe's first Industrial Micro-Factory and €100,000 Hardware Accelerator.
We don't take your equity; we build your product.

TRANSMISSION_001

THE ZERO-EQUITY
PROTOCOL

We are bridging the gap between "Napkin Sketch" and "Mass Production."

The Fund

€100,000 in Manufacturing Credits.

The Deal

0% Equity. 5% Success Royalty.

The Goal

Sovereign manufacturing for Maltese and EU founders.

€100K
MANUFACTURING CREDITS
0%
EQUITY TAKEN
5%
SUCCESS ROYALTY
TRANSMISSION_002

THE ARSENAL

State-of-the-art manufacturing equipment at your disposal. Build, prototype, and scale with industrial-grade precision.

2M Large Format 3D Printing

2M LARGE FORMAT

3D PRINTING
  • Build Volume: 2000 x 1600 x 1200mm
  • Layer Resolution: 0.1mm
  • Materials: PLA, PETG, ABS, Nylon
  • Industrial Grade Output
4M CNC

4M CNC

MACHINING
  • Work Area: 4000 x 2000 x 150mm
  • Spindle Speed: 24,000 RPM
  • Precision: ±0.01mm
  • Multi-Axis Capability
Fiber Laser

FIBER

LASERS
  • Power: Up to 3kW
  • Cutting Speed: 20m/min
  • Materials: Steel, Aluminum, Titanium, Brass
  • Precision Engraving
Fine Art Printing

HAHNEMUHLE

GOLD CERTIFIED
  • Resolution: 2400 x 1200 DPI
  • Color Gamut: 99% Adobe RGB
  • Fine Art Printing
  • Archival Quality Output

Ready to access the arsenal?

View Documentation
TRANSMISSION_003

THE TIERS

Choose your acceleration path. Both tiers include full access to our industrial arsenal and expert guidance.

SEED TIER

€5,000
For early-stage prototyping and validation
  • €5,000 equipment credit
  • Access to all machinery
  • 40 hours facility access/month
  • Technical consultation
  • Workshop space access
  • Community network
  • Prototype development support
  • Material procurement assistance
APPLY FOR SEED TIER
Application Process
01. SUBMITComplete the application form with your project details and vision.
02. REVIEWOur team evaluates your hardware concept and manufacturing needs.
03. BUILDGet approved and start building with full facility access.
TRANSMISSION_004

THE 2026 INTAKE SCHEDULE

Area 51 operates on a rolling application basis throughout the year, split into four selection windows. While we are open to all hardware and physical product categories, our selection is based on the best fit for our industrial arsenal at the time of application.

Wave 1 (Active)

LOADING…
  • Submissions Close February 15, 2026
  • Adjudication Feb 16 – Feb 28
  • Production Start March 1
VIEW TIERS

Wave 2

[ COMING SOON ]
  • Submissions Close TBD
  • Adjudication TBD
  • Production Start TBD

Next Waves

Wave 2 Applications open May 2026
Wave 3 Applications open August 2026
Wave 4 Applications open October 2026
Selection Criteria:
Area 51 accepts projects across a range of physical product categories, provided they are ready for structured production. We evaluate applications based on feasibility, production readiness, and alignment with our current industrial capabilities.